The offer
Provenance Assessment
Two weeks, one pipeline. You leave with signed evidence you can show an auditor, a regulator, or a board — and an honest list of what you still can't prove.
Four questions. All four should be yes.
Tick each one that's true for your team. This is the same filter I apply on the free call — it saves both of us time.
A deliverable you can file, not a deck you'll lose
A written readiness report
A concrete gap list mapped to the duties that apply to you — EU AI Act record-keeping and transparency, ISO/IEC 42001, or the Gulf guidance. What you can prove today, and what you can't.
Signed evidence for one workflow
One end-to-end trace through a real workflow, graded link by link and signed — the artifact you can show when someone asks “where did that answer come from?”
A coverage map
A plain-English statement of what the evidence does and doesn't cover, written for your counsel or compliance team to review.
A clear next step
Whether that's an annual licence, a second assessment on another pipeline, or nothing at all — I'll tell you straight, including when the honest answer is “you don't need me.”
What actually happens
Scope and inventory
We pick one consequential workflow and list every model, agent, tool and source in its chain — versions, locations, owners.
Classify and map
Which frameworks apply to this system, and which specific duties (logging, transparency, documentation, oversight) map to which part of the pipeline.
Trace one real decision
We instrument a single end-to-end run and capture the actual chain a real answer travelled through — not a demo path.
Grade and sign
ISNAD grades each link, caps the chain at its weakest link, and signs the record. Where the evidence is thin, we say so.
Write the report
You get the readiness report, the signed evidence, and the coverage map — plus my recommendation on what to do next.
Transparent, because the work is defined
for the first 2 design partners · €7,500 after · two weeks · one pipeline
Payment by bank transfer: 50% on signing, 50% on delivery. Credited in full toward an annual licence if you sign within 60 days.
What this is not
A technical readiness review — not an Article 43 conformity assessment and not a notified body. It does not make a system conform with any regulation, and it is not legal advice.